The proceedings are being conducted in an area 500 square meters with an investment of 106,953.92 euros.
The general director of the Physical Activity and Sport, Antonio Penalver, and Councillor for Public Works and Services, Eliseo Sanchez, visited the start of renovation and improvement in the locker room of the summer swimming located at the Municipal Sports .
Specifically, it is conducting a comprehensive reform of coatings on the inside and on the facade and interior divisions and building facilities.
Among the actions that are being developed can mention the creation of a multipurpose hall, reception, nursing, lobby, male and female locker rooms, dressing rooms and storage adapted.
The performances in the sports center changing rooms are provided on a surface of 500 square meters with an investment of 106,953.92 euros.
Note that these works are part of the comprehensive improvement project that is developing in public swimming pools in Puerto Lumbreras summer after the serious damage suffered from the floods last year.
Source: Ayuntamiento de Puerto Lumbreras