Portal de Puerto Lumbreras

www.portaldepuertolumbreras.com

Puerto Lumbreras - SpanishPuerto Lumbreras - English
detail of Puerto Lumbreras

 

Work begins on adequacy of watercourses and construction of storm sewers in place "The Coloraos" (22/09/2008)

Councilman Works and Environment of the Municipality of Puerto Lumbreras, Eliseo Sanchez reported this morning the beginning of the works of adaptation and renewal of networks in the area of "Coloraos" which involves the construction of storm sewers and sanitation to to channel water from the rain so it does not flow through the town streets.

The area north of town near the Mediterranean motorway (A7), and topography of the site in clay-type rainy season that produced many tows, water circulating in the area on the ground to reach the lowest points of river reaching the streets.

For the same reason the actions to be carried out under the channeling of water through the construction of walls and the conditioning of the environment to be an urban area, located next to the new school "Sacred Heart."

With a budget of over € 460,000, will proceed to the suitability of the course of the wadi and the creation of collectors Sewage runoff with the provision of a filler to achieve a reduction in the slopes of the slope and the subsequent creation of walls at different levels, which will decrease the speed of the water, and the possible retention of materials that the water gets carried away.

The collection of water that infiltrates will lead to a well that will serve as a discharge chamber located at the bottom of the river, to the sewer located on Avenida Rey Juan Carlos I.

The first of the collectors will be located on the street Garro Antonio Martínez and the second one is located under the street, The Rocks, with a total of 985 meters.

This action also brings the treatment of slopes that form the watershed by planting vegetation to reduce runoff coefficient and the landscape treatment.

'The performances of these areas are badly needed, especially in winter, when weather conditions are often adverse, with the resulting rainfall, "according to statements by Eliseo Sánchez-adding' the works completed in one year and provide solution the problem of stagnant water in the area, and a new image, thus paving of streets and new sidewalks, filling the need of the neighbors'.

In the same way, taking into account the current situation of water resources found in the basin irrigation, which requires the fullest and without delay all available resources, it is estimated necessary to carry out works to allow uptake of these resources for storage and use at times like this lack.

Source: Ayuntamiento de Puerto Lumbreras

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información